Monday 7 January 2013

Piping in the new year

Forgot to add that we bumped into Dave at the weekend.  He had fitted the pipes for the new air ducts for the sewage tanks.  And a fine job he had done too.  You saw in a previous post the wardrobe and the concrete cruncher.  Dave fitted the pipes and they are ready to go.

Pipes under the main cabin


Sorry for the orientation.  This needs turning but shows the pipe from the hull through the wardrobe floor.  One pipe in each wardrobe.


Another view of the pipes in the hull.


No comments:

Post a Comment